Norwegian buyers of Turkish property, whether a resale apartment in Alanya or a delivered unit in a recently completed Istanbul development, often assume that a habitation permit (iskan) is the final word on build quality. It is not. An iskan confirms the building is legally registered and connected to utilities. It says nothing about whether the concrete cure was properly managed, whether waterproofing membranes were installed to specification, or whether the electrical panel meets the load the unit actually draws. For a Norwegian investor accustomed to TEK17 building code enforcement and mandatory independent control at home, this gap is worth taking seriously before signing a transfer deed.

Why an independent inspection matters more in Türkiye than at home

Norway's construction sector runs on a system of uavhengig kontroll, independent third-party verification of structural and moisture-critical work, built into the building code itself. Türkiye's inspection regime has strengthened considerably since 1999, with licensed building inspection firms (yapı denetim) now mandatory on new construction. But the inspector is typically selected and paid through a process the developer influences, and the scope of that inspection is regulatory compliance, not the buyer's specific unit condition at handover. A pre-purchase or pre-handover inspection commissioned directly by the buyer is a separate, additional layer, and in Türkiye it is optional rather than standard practice among individual buyers. Most Norwegian purchasers who skip it do so simply because nobody suggested it as a normal step.

What a defect inspection should actually cover

A useful checklist for a Turkish residential unit, whether new-build or resale, groups defects into categories that map to where cost and dispute risk concentrate later.

Structural and envelope : visible cracking in load-bearing walls or slabs, evidence of settlement, roof and terrace waterproofing integrity, and window and door frame alignment. Coastal properties in particular warrant attention to render and coating condition, since salt air accelerates façade deterioration faster than inland buildings.

Water and moisture : bathroom and kitchen waterproofing at floor-wall junctions, visible staining on ceilings below wet areas, and pressure testing of plumbing where accessible. Leaks originating in a shared slab are a recurring dispute source in Turkish apartment blocks, precisely because responsibility crosses individual unit boundaries into shared building elements.

Mechanical and electrical : panel labeling and breaker capacity, earthing continuity, HVAC unit condition and refrigerant lines if a split system is installed, and whether the unit's electrical installation matches what was represented in the sales brochure. Voltage and plug standards differ from Norway, so this is also the moment to confirm any appliances included in the sale are compatible or will be replaced.

Finishes and fit-out : flooring level and adhesion, tiling grout condition, door and cabinet hardware function, and paint or plaster consistency. These are the items most likely to be cosmetic rather than material, but they still belong on a written punch list with the developer before final payment, particularly on off-plan purchases nearing delivery.

Documentation cross-check : confirming the delivered unit's floor area, room configuration, and finishes match the sales contract and any marketing materials, since discrepancies here are easier to resolve before the deed transfers than after.

Sequencing the inspection around payment

For off-plan purchases, the inspection should occur before the final installment is released, not after keys are handed over. Most Turkish sales contracts tie the last payment tranche to delivery, which gives the buyer real leverage to require defect remediation as a condition of final payment. Once the deed is transferred and the full price paid, that leverage largely disappears and remaining issues become negotiation rather than contractual obligation.

Working with an independent inspector

The inspector should be engaged directly by the buyer, report in writing, and have no commercial relationship with the developer or selling agent. For a Norwegian buyer managing the process remotely, a local advisory firm can coordinate the inspection date, translate findings into a punch list the developer will act on, and confirm remediation before funds are released. This kind of hands-on coordination is where an experienced Türkiye-based advisor earns their fee, closing the gap between what a Norwegian buyer expects from a routine handover and what actually needs to be checked on the ground.

A modest inspection fee, typically a small fraction of one percent of the purchase price, is inexpensive insurance against defects that are far costlier to remediate once ownership and occupancy have changed hands.